Spokes Canterbury
  • ABOUT
    • OUR MISSION
    • OUR BACKGROUND
    • OUR TEAM
    • CONSTITUTION of SPOKES CANTERBURY
  • GET INVOLVED
  • SUBMISSIONS
  • BLOG
  • RESOURCES
    • GETTING ON A BIKE
    • MAPS AND RIDES
    • BIKE SHOPS
    • REPORT AN ISSUE
    • COMMUNITY
    • EVENTS
  • CONTACT
  • DONATE
  • ABOUT
    • OUR MISSION
    • OUR BACKGROUND
    • OUR TEAM
    • CONSTITUTION of SPOKES CANTERBURY
  • GET INVOLVED
  • SUBMISSIONS
  • BLOG
  • RESOURCES
    • GETTING ON A BIKE
    • MAPS AND RIDES
    • BIKE SHOPS
    • REPORT AN ISSUE
    • COMMUNITY
    • EVENTS
  • CONTACT
  • DONATE
4 August 2017  |  By Dirk De Lu In Submissions

Cathedral Square draft sub

CHCH 1935

Basic Information
Regenerate Chch info@regeneratechristchurch.nz and 03 353 9600

Press https://www.stuff.co.nz/the-press/news/95268876/dramatic-changes-unveiled-will-reshape-christchurchs-cathedral-square

“The square has to be a destination, not just a place to pass through.” ‘Regenerate Christchurch chief executive Ivan Iafeta’

“The plan included improving links to the square by upgrading surrounding lanes and streets. Traffic, except perhaps for public transport like the tram, would go. New forms of transport such as light rail, electric shuttles or an aerial gondola were other possibilities.”
“Special powers under the Greater Christchurch Regeneration Act could be used to make the changed needed”

Links to consultation web pages https://engage.regeneratechristchurch.nz/
Pdf of concept plan and key moves https://engage.regeneratechristchurch.nz/28887/documents/60060

Pdf transport file:///C:/Users/Dirk/Documents/Submission%20Source%20docs/CCC%20Cathedral%20Sq%20transp%202017.pdf

Closes 21.8

Draft sub

Submission

Spokes looks forward to the Square being rebuilt in alignment with the clear desire for a pedestrian and cycle friendly city expressed in Share an Idea.

Regenerate/Otakaro as successor to CERA is tasked with implementing the Accessible City Plan including the Transport Chapter. That chapter shows both Worcester and Colombo Streets as major cycle routes. This was a grievous mistake.

Pedestrian friendly areas are best when not in competition with through roads for cars, buses, bikes. Good cycle infrastructure does not direct bicycle routes into heavily congested public spaces. Sharing is important for all users of public spaces, whether roads or gathering areas. Good planning acknowledges that sometimes sharing is not an option, Spokes notes that the plans recognize this fact by excluding motorized vehicles from the Square.

Spokes submitted to the Accessible City Transport Chapter our concerns with designated cycle routes going through the Square and the lack of routes for commuter cyclists. Spokes asked that the plans be revisited including people who cycle to help select workable routes. It is clear that cycling and cycle parking in the Square are a necessary part of city life. Providing alternate cycle routes to minimize conflicts with pedestrians and events are equally necessary.

Ivan Iafeta, CEO Regenerate Christchurch recognizes the need to provide effective alternative routes as quoted in a 31 July Press article. “The plan included improving links to the square by upgrading surrounding lanes and streets.” No doubt this will require significant infrastructure. That there are funds and the power to do this is made clear by Mr Iafeta’s further comment “New forms of transport such as light rail, electric shuttles or an aerial gondola were other possibilities…. Special powers under the Greater Christchurch Regeneration Act could be used to make the changed needed”  https://www.stuff.co.nz/the-press/news/95268876/dramatic-changes-unveiled-will-reshape-christchurchs-cathedral-square

Spokes appreciates that the design suggestions offered are merely to start the conversation. Our concern based on what has been released is that cycling routes and cycle parking are clearly prioritized as tasks to be completed once all other improvements have been consulted and agreed upon. Bitter experience is that this business as usual approach disadvantages people who would like to cycle and results in unsatisfactory outcomes for all involved.

Spokes urges Otakaro and Regenerate to include cycling infrastructure as required by the Accessible City Plan and looks forward to working closely with Otakaro and Regenerate to plan and design this infrastructure. Making Colombo and Worcester Streets through north/south and east/west routes as shown will require immediate attention and funding. Designating Cathedral Square Street which circumnavigates Cathedral Square as a slow cycle street with limited vehicle access is one solution.

The Christchurch Central Recovery Plan promised “A growing number of high-quality cycle parking facilities will be provided. These will be secure, covered where possible and located at a range of key destinations.”

The Accessible City Plan Transport chapter promised “Cycling will be encouraged in the central city. Routes for both commuter and recreational cyclists will offer good connections from the wider city into the central city and the Core.”

Spokes further noted that over 3,000 car parks are promised within a 2-5 minute walk from the Square. With Share an Idea asking for parking on the periphery with shuttles to the central city the emphasis on car parking and the lack of detail for cycle parking undermines confidence in the effectiveness of consultations past and current.

Without complete plans people who use bicycles are inherently disadvantaged in this consultation process. Spokes calls for plentiful, convenient, secure and easily expandable bicycle parking in and adjacent to the Square. Spokes stresses the need for a full review of how to make Colombo and Worcester cycle routes connect without going through the Square and seeks to be an active participant in this process.

Development of the Square with major cycle routes going through it is clearly counter to the design goals stated for a family friendly, event friendly community space and for the priority of cycle routes indicated but not delivered by the Accessible City Transport Chapter.

Spokes requests that the opportunity for real consultation, denied in the Accessible City Transport chapter process, now be taken up to allow for successful development of the Square. Building community will require inclusion and empowerment for all stakeholders, including people who cycle for commuting and pleasure. Genuine community involvment in making Christchurch the pedestrian and cycle friendly city envisioned by the public in Share and Idea alluded to in the Accessible City Plan and promoted by Christchurch City Council’s policies is long past due.

Infrastructure Otakaro Ltd
Previous StoryNZTA Speed Limit setting Consultation
Next StoryMoving on from the almighty car: A change up for Christchurch’s transport mix

Related Articles

  • SH1 Rolleston Flyover - NZTA
  • Bicycle_Accident
    CCC Colombo to Papanui

Leave your comment Cancel Reply

(will not be shared)

Latest Posts

  • Bike Valet at Ninja Valley Christchurch Friday, 18, Apr
  • Put People Ahead Of The Road Lobby, Say Transport Advocates Wednesday, 26, Feb
  • ECAN Long Term Plan 2024-2034 Tuesday, 24, Dec
  • Climate Change Commission Consultation on Emissions Budgets Tuesday, 24, Dec
  • Safer Speed Plan Tuesday, 24, Dec

Recent Comments

  • cecile on Ensors Road, Brougham Street, Opawa
  • Photo of the Day: Belfast Rd Cycle Subway – Cycling in Christchurch on CCC CNC DEMP Northern Arterial

Categories

Tags

Accessible City Annual General Meeting Central Business District Central Christchurch Christchurch City Council Constitution East Christchurch Infrastructure Major Cycle Routes Neighbourhood Streets North Christchurch Otakaro Ltd Policy Public Transport Recreation Safety Improvements School Streets Selwyn District Council Slow Speeds South Christchurch Speed Limits Waimakariri District Council Waka Kotahi West Christchurch

Archives

  • April 2025
  • February 2025
  • December 2024
  • October 2024
  • August 2024
  • June 2024
  • May 2024
  • December 2023
  • October 2023
  • January 2023
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • March 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • February 2021
  • October 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • November 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • December 2018
  • November 2018
  • September 2018
  • August 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • December 2017
  • September 2017
  • August 2017
  • July 2017
  • May 2017
  • March 2017
  • January 2017
  • December 2016

About

Spokes is a non-profit organisation run by volunteers that create ways for the people of Canterbury get more out of their bike rides.
 

Follow Spokes on Facebook:

WHO WE ARE

  • OUR TEAM
  • CONTACT

SPOKES NEWSLETTER

WHAT WE DO

  • OUR MISSION
  • SUBMISSIONS

ABOUT US

A member organisation of CAN (Cycle Action Network) NZ. We're a non-profit, all-volunteer organisation dedicated to making cycling work for the Christchurch community.

FOLLOW SPOKES

AFFILIATES