Waterloo Road Safety Improvements

Ref: https://www.ccc.govt.nz/the-council/haveyoursay/show/439 Introduction “Spokes” – Spokes Canterbury (http://www.spokes.org.nz/) – is a local cycling advocacy group with approximately 1,200 followers.  Spokes is affiliated with the national Cycling Action Network (CAN – https://can.org.nz/).  Spokes is dedicated to including cycling as an everyday form of transport in the greater Christchurch and Canterbury areas. We would like the opportunity […]

GoogleMap.NorthcoteRd.and.surroundings

Northcote Road and Lydia Street Transport Improvements

Ref: https://www.ccc.govt.nz/the-council/haveyoursay/show/528 Introduction “Spokes” – Spokes Canterbury (http://www.spokes.org.nz/) – is a local cycling advocacy group with approximately 1,200 followers and is affiliated with the national Cycling Action Network (CAN – https://can.org.nz/).  Spokes is dedicated to including cycling as an everyday form of transport in the greater Christchurch and Canterbury areas. We would like the opportunity […]

Worcester Street cycleway connection (CCC – 488)

Spokes Submission to CCC on Worcester Street cycleway connection https://ccc.govt.nz/the–council/haveyoursay/show/488 Introduction Spokes Canterbury (http://www.spokes.org.nz/) is a local cycling advocacy group with approximately 1,200 members and is affiliated with the national Cycling Action Network (CAN – https://can.org.nz/).  Spokes is dedicated to including cycling as an everyday form of transport in the greater Christchurch area. We would […]

Antigua Street cycle improvements (CCC – 487)

Ref: https://ccc.govt.nz/the-council/haveyoursay/show/487 Introduction Spokes Canterbury (http://www.spokes.org.nz/) is a local cycling advocacy group with approximately 1,200 members and is affiliated with the national Cycling Action Network (CAN – https://can.org.nz/). Spokes is dedicated to including cycling as an everyday form of transport in the greater Christchurch area. We would like the opportunity to appear at any public […]

parking in the cycle lane

CCC MCR S Express Making Elizabeth St more Car friendly

S Express MCR Elizabeth St/Division St Redux    Due 12 June Once again Council has sided with the NIMBY’s to downgrade safety on a Major Cycle Route. It will take LOTS of individual submissions to overcome this. Please take the few minutes necessary to speak out for the right of people to cycle safely. Link https://www.ccc.govt.nz/the-council/consultations-and-submissions/haveyoursay/show/243 […]

urban traffic

CCC CNC DEMP Northern Arterial

Subs due 15 April link https://www.ccc.govt.nz/the-council/consultations-and-submissions/haveyoursay/show/226 With millions already spent to create car dependency and gridlock it will take lots of submissions to stop this madness. Help out the neighbourhoods in the north east of Christchurch while also working for better cycling infrastructure. Even a simple sub stating non support and asking for public and […]

on st car parks

CCC Annual Plan 2019

CCC Annual Plan     Due 1 April Please make a sub Now. Even a short sub counts and Spoke’s sub is counted as one by Council. Link https://www.ccc.govt.nz/the-council/consultations-and-submissions/haveyoursay/show/227 The link provides links to both the summary and complete draft Long Term Plans. Spokes supports Council’s moving forward the completion dates of Major Cycle Routes, MCR’s. Spokes […]

Lincoln-Rd-plans

CCC Lincoln Road Bus Priority and cycling

CCC Lincoln Bus Lanes and Cycling Closes 4.12.18 https://www.ccc.govt.nz/the-council/consultations-and-submissions/haveyoursay/show/184 Christchurch – Where the Future is On the Bus Submission made to CCC 4.12.18 This plan continues to build for cars, prioritizes this route for buses and offers leftovers for people on bicycles. This is business as usual with a few tweaks. Albert Einstein observed “The […]

sharedpath_250x412

CCC Quarryman’s Trail Changes

Quarryman’s Trail to be on South of Sparks Closes 12 September. https://www.ccc.govt.nz/the-council/consultations-and-submissions/haveyoursay/show/179 Links from above page called plans, but each is a continuation of the project. There are not several plans on offer. Note that these are sheets 1-4 and presented out of order on the site. Sheet numbers on middle bottom of each sheet. […]