sharedpath_250x412

CCC Quarryman’s Trail Changes

Quarryman’s Trail to be on South of Sparks Closes 12 September. https://www.ccc.govt.nz/the-council/consultations-and-submissions/haveyoursay/show/179 Links from above page called plans, but each is a continuation of the project. There are not several plans on offer. Note that these are sheets 1-4 and presented out of order on the site. Sheet numbers on middle bottom of each sheet. […]

Map2

CCC Slow Speed Extension

CCC Slow Speed Extension Sub http://cccgovtnz.cwp.govt.nz/the-council/consultations-and-submissions/haveyoursay/show/177 Closes 4 September Spokes Canterbury generally supports lowering speed limits as presented in this proposal. The 10km/h limit is likely to be unrealistic as many people will cycle at a slightly faster rate simply to maintain balance and manoeuvrability. With cycling in the central city primarily on shared streets […]

CCC Barrington Driveway

CCC Barrington Mall Driveway

Not much room to do what is needed but some tweaking would really help. Subs in support just to remind Council that we would like to stay alive are always a good idea. Barrington Mall Driveway to be made a bit safer, for cars and pedestrians. Closes 22 August https://www.ccc.govt.nz/the-council/consultations-and-submissions/haveyoursay/show/112 Spokes draft sub The Setting […]